RCN Renovation

This was a fast track project, which entailed renovating an existing 10,000+ sq. ft. space to RCN’s specifications. MCM was responsible for the General Construction and a separate Prime was responsible for performance of the MEP scope. Our scope included demolition, sitework, masonry restoration, new walls, roofing, flooring, carpentry, acoustical and drywall ceilings, finishes, etc.

rcn_renovation

Work was performed 7 days per week, days and evenings to minimize RCN’s profit loss. The original scope was performed in accordance with the construction documents and the balance was performed via a design build at the job-site on a daily basis.