Catelli Brothers

PROJECT DESCRIPTION: 32,000 Square Foot Renovation and Addition to Existing Lamb and Veal Processing Plant Facility

The addition allowed for expansion to CBI’s cold storage areas and modification of the existing conveying systems into the new facility. All work was performed in a very confined surrounding area and the existing plant stayed fully operational at all times during construction. Addition entailed a 6’ elevation change from the existing to the new structure.

The new structure was structural steel bearing with an exterior 8” split face masonry system. The interior walls and ceilings at the cold storage and freezer areas were constructed utilizing 4” to 6” insulated panels. Modified bituminous and metal panels were utilized for roofing with insulated glass, utilized at the future office expansion at the second floor. Interior finishes at the receiving area included stainless steel door wraps and bollards, ceramic tile floors, FRP and wood doors, toilet partitions, epoxy paints, etc.

The blast freezer/cooler areas and loading dock areas were constructed with hi-speed roll-up doors. The mechanical, plumbing, sprinkler and electrical scopes of work for the freezer expansion were performed utilizing a design/build concept between the Owner, Architect and MCM.

no images were found